We have the outside forms up. We attached the plywood forms to the concrete blocks with concrete screws. They should hold pretty well. The bottom crown molding will go back up on the left side before we pour.
We have the outside forms up. We attached the plywood forms to the concrete blocks with concrete screws. They should hold pretty well. The bottom crown molding will go back up on the left side before we pour.
Stonework is lookin good. Real good. I guess this means another 80 bags of concrete.
Almost done!
LikeLiked by 1 person
That was a very good guess. We estimated 81 bags. To complete the wall it is 44 inches tall, 10 inches wide and 14 feet long.
LikeLike
So what happens if you want to change the crown molding?
LikeLiked by 1 person
Ha! That’s not gonna happen. =)