This week’s video is about when we discovered that the south dormer had moved. We set about getting ready to dismantle the dormer before it can fall down. Kerry does some fancy Bertha driving to wedge her in between a big tree and the Mooreland House. Obviously we put the Powder Room project on hold until we get this thing down.
Month: July 2022
Gordon Was Right
Gordon made a comment on our most recent video about revisiting some of our other roof temporary fixes. We did plan on checking them but not this week. Ms Mooreland had other plans. This first heavy rain proved that our fix was no longer valid. We had to stretch a tarp inside the attic to catch all the water. We have another more permanent temporary roof on the back of the Mooreland House now.




Two Roofs
In this week’s video we show how we put another tarp on the little flat roof and we put the permanent underlayment on the back flat roof. These improvements have slowed down the water again and will give us a chance to breathe again while we get some other stuff done.
Collapsible Floor
We get most of the floor knocked down into the basement. As people that follow the blog you know that this is the last rotten wood video for a while. Onto the roof we go to stop some water next week.
It Reached!
The boom jib extension for the 54 foot forklift just barely reached the pedestal at the top of the dormer. It made it though. We had to remove the scaffolding walkboards in order to get the pedestal down. We have to be a little more precise on where we place the forklift. We have the height but we can’t quite get far enough to raise the stones straight up. Kerry does a great job of driving Bertha so it was no problem.




Thirty Feet
We set up thirty feet of scaffolding on the front portico and tied it into the Mooreland House. Frank didn’t get an overall picture after it was done but we have a couple when it was at 20 feet. For those who are curious, Frank has to stand on the scaffolding to hook up the stones to the new boom jib. It won’t be nearly as easy as standing in the work platform and using the davit crane. Frank took a few pictures of the top stones and was able to remove the finial without Bertha’s help. The gaps between stones is the missing mortar that has been allowed to let water into the walls for years. Mortar needs to be touched up every 50 years or so. =)






Boom Jib
We have the extension we ordered. We now have enough height to reach the front middle dormer facade. Kerry made sure to weight test it so we should be able to pick up the big stones in the dormer. Bertha has a very long reach now.



Buttoned Up
Okay, the south facing dormer facade is now weather resistant. Guess we called it Option 2. Even though it’s not perfect it will still block more water from getting in than the stone and brick did. Moving on.






On The Ground
The south facing dormer facade is now comfortably resting on the ground. This is a much better place for it because now it can’t hurt itself or anything else. Sometimes things need protected from themselves even if they don’t know they are a threat.





More Debris Removal
In this week’s video we take down a wall and reveal what lies beneath the fallen debris in the Powder Room. There certainly wasn’t much floor to speak of. Be prepared for a shocking reveal as we pull back the carpet!