We put up a new gate back in September and we thought it would make a great Christmas Day video. Kerry decorated the gate for fall and Christmas. It made the entrance to the Mooreland House look very festive. This gate is a drastic improvement over the pvc pipe we had across the entrance before.
Month: December 2022
Frank’s Away
Frank went to “work” back in September and Kerry stayed to WORK on the Mooreland House. Kerry single handedly spruced up the entire place. We put a diagrams so you could keep track of where Kerry was in the house as she went through with her broom and bucket. Hope you enjoy the satisfying time lapse videos.
Metal Roof!
We finally had to break down and put on a new metal roof. The garage really needed it. It’s so nice to be able to put things inside now that we don’t want getting wet. Now we can get back to the Mooreland House.
Dirt Work!
We begin the process of sloping the land away from the Mooreland House. In the process we uncover a treasure trove of termites! We have never seen this many termites in one place. This should help the basement dry out.